Network Rollout

  1. mobile-tower2Site taken over from acquisition team and preparation of site layout and soil testing
    EB and municipality liaison
    Civil-Mechanical-Electrical projects for Cell site Infra
    Turnkey Telecom project rollout
    Manufacturing of Telecom Towers
    Project Monitoring Services
    RF survey
    Site & System Audits
    Logistics associated with project rollout
    Electrical works for BTS including augmentation of utilities at per with load based design
    Foundation and erection of telecom tower ranging from RTP (9 metre) to 100 metre.
    Foundation of Civil shelter and Base Construction of prefab shelter
    Resource facility management
    Optic Fibre cable laying
    BTS & Microwave Installation
    Single Cell Functionality Test
    EMF survey & radiation measurement

    Scope of Work with INDUS (Passive Operation & Maintenance)
    Currently maintaining 2500+ cell sites Passive infra of Indus ROWB circle
    AMC service for all utilities like DG, AC, SMPS, PIU, Battery Bank, Power Plant etc.
    Handling of Site rent, EB payment
    Full support to Security Management System (SMS) services to maintain assets at far end isolated cell sites and escalation to team for effective Fault management.
    Alarm monitoring for assigned site from TOC (Telecom operating Centre) Through client terminal established at Welkin’s premises
    Diesel filling against petro card provided by INDUS Tower
    Scope of Work with Vodafone in Bihar/Jharkhand, NESA, Orissa
    Comprehensive Annual Maintenance Contract (CAMC) for the services of all the passive infrastructure stroke utilities like DG, AC, SMPS, Battery Bank, Power Plant, Transformer etc.
    Handling of Caretaker/Site Security guard, EB payment, Diesel filling etc
    Alarm monitoring for Assigned sites from OMCR at Vodafone premises
    Materials logistics and reconciliation
    Liaison with OEM partners and others
    Support to infra project
    I&C of active equipments
    Scope of Work with NSN/Vodafone/ZTE/Samsung
    Site Survey & SDR preparation
    BTS installation and commissioning
    Power Plant & BB installation
    Survey, I&C of a new Backbone(PDH/SDH/Ethernet on Radio) Link
    Long Haul/Short Haul MW Hop Installation and commissioning
    MW Hop up gradation 1+0 to 1+1
    COW (or NOW) BTS I&C COW Microwave Implementation
    Survey and I&C of IBS
    BTS Swapping, Up gradation, Cabinet Expansion and dismantling including survey
    Skilled Engineer and Rigger supply on call basis
    I &C of 3G equipments Node B
    RFI survey and I&C of 4G e-Node B
    SCFT and optimization of 2G, 3G & 4G sites
    ATP of all the activities and uploading the documents in portal
    EMF survey and BB/NB measurement Plus TERM cell testing as and when demanded